1 পরীক্ষায় এসেছে
A hydro-electric power plant works at a head of 200 m. If a flow rate of 10 m^{3}/s is maintained through the turbine and the combined turbine–generator efficiency is 76.5 %, what electric power is available? (Answer in MW.)
শেয়ারTH-0016